For Salón Gourmets Madrid 2027, you should aim to place your stand order by August 2026 at the latest. That gives us enough time for proper design, IFEMA Madrid approval, and manufacturing without rushing. Booking earlier, perhaps by May or June 2026, offers more choice and better rates, especially for custom builds.

The countdown to Salón Gourmets Madrid opening day

Salón Gourmets Madrid is a big one. It runs from 26 April 2027 to 29 April 2027. That might seem a long way off, but for something as important as your stand at IFEMA Madrid, time flies. This show is about premium food and drink, so your stand isn't just a place; it's a statement. You'll need tasting areas, wine sampling points, and a professional look that screams quality. Hygiene is also key. We build turnkey stands that combine all these elements.

Thinking about a custom stand for Salón Gourmets Madrid? You need to work backwards from that opening day. Every stage has its own demands, and some things just can't be rushed. Getting this right means your brand looks its best and you avoid unnecessary stress and costs.

Milestones: brief, design, approval, manufacturing

First up is the brief. This is where you tell us what you need: your budget, how much product you'll display, tasting requirements, and your brand image. Be clear. We take that information and turn it into a design concept.

Next, design and 3D prototype. We'll produce a 3D prototype in 72 hours. This shows you exactly what your stand will look like. You can make changes here. We won't start building until you're happy. Our "Audited Project" guarantee means what you see in the prototype is what gets built. Once you sign off on the design, we provide a closed quote in 24 hours.

Venue approval is critical. IFEMA Madrid has rules, and you'll find them all in the exhibitor manual. This covers everything from stand height to electrical connections and health and safety. We handle this submission for you. It takes time, and if there are revisions, that adds more time. Don't underestimate this step; late submissions or rejections can cause serious delays.

Then comes manufacturing. With our own workshop, we build everything in-house. This gives us control over quality and timing. It also means we can adapt if needed. Depending on the complexity, manufacturing can take several weeks.

Build-up and dismantling at IFEMA

Once the stand is built, it needs to get to IFEMA Madrid. Transport has to be planned carefully. Then it's build-up. IFEMA Madrid assigns specific dates and times for this. It's a busy place with lots of other exhibitors, so logistics are tight. Our stand design and assembly team in Madrid has over 20 years of experience with these venues. We're used to the hustle and bustle.

During build-up, we install everything: structure, flooring, lighting, graphics, and any specialised equipment like tasting counters or refrigeration. We make sure everything is perfect before you arrive. This is when all the planning pays off.

After the show, it's dismantling. This also has strict timelines from IFEMA Madrid. We take down the stand efficiently and remove all materials. It's a quick turnaround, so organisation is key.

Running late? What can still be done

If you're reading this and Salón Gourmets Madrid 2027 is closer than you'd like, don't panic. There are still options. The most important thing is to get in touch with us immediately. The sooner, the better.

We can sometimes fast-track designs and manufacturing. This might mean working with a more standardised design or a modular system rather than a fully custom build. We've built stands for Madrid Horse Week and Fruit Attraction Madrid under tight deadlines before.

Venue approval might become an express submission if IFEMA Madrid offers that option, but it often comes with higher fees. We'll check the exhibitor manual for any specific rules regarding late submissions.

Late orders can sometimes limit material choices or increase transport costs if we need to use dedicated services. We'll be transparent about any additional charges this might incur. Our aim is to still deliver a high-quality stand that meets your needs, even with less time.

Frequently asked questions

What is the absolute last moment I can order a stand for Salón Gourmets Madrid?

While we strongly recommend ordering by August 2026, for a very basic stand, we might be able to manage something as late as early 2027. This would severely limit design options and likely incur extra costs due to expedited processes.

Can I get a custom stand if I order late?

A fully bespoke custom stand becomes very difficult to deliver if ordered less than six months before the show. We can explore custom elements within a modular framework, which offers some flexibility on a shorter timeline.

What happens if IFEMA Madrid rejects my stand design?

If IFEMA Madrid rejects a design, we work quickly to make the necessary amendments and resubmit. This is why early submission is crucial; it provides a buffer for any revisions without impacting build-up schedules.

Your stand at Salón Gourmets Madrid: a quote in 24h

Tell us your square metres and your goal and we send you a proposal with a 3D prototype in 72h and a closed quote in 24h, manufactured in our own workshop and installed turnkey at IFEMA. What you see in the prototype is what gets built.

Next edition: 26 April 2027 – 29 April 2027 · IFEMA Madrid

Request a quote for Salón Gourmets Madrid

More about the show: Salón Gourmets Madrid · Stand design and assembly in Madrid · Stand builder in Madrid · Other shows in Madrid: Madrid Horse Week · Fruit Attraction Madrid

Patricia Jiménez (Pat)

Hi! I'm Pat.

Free service

If you are looking to expand in Spain and Portugal, build a plan with us. We offer you nationwide presence and cost-saving synergies.